Lift Bridge
Basic Information
Name: Lift Bridge
Built by: Bob Osterhoudt with help from Jack Leibowitz
Size: 4ft x 26in
Introduction
This module provides access to the inside of the layout. The surface of the module hinges on the left to create an open walkway. The walkway base has ramps on the front and the back as a handi-accessible feature. The bridge is mechanically locked by a pin which is magnetically moved using a switch. The main lines are powered off before the bridge is unlocked to prevent trains from escaping the layout. The electrical system was replaced and upgraded with relays in 2024 by George Barrier and Bob Osterhoudt.
Construction
AREA UNDER CONSTRUCTION

A Picture
Details
A Picture
Details
